Our Work
![West Seneca CSD](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/Cell-Phone-147-400x250.jpg)
West Seneca CSD
This project was between three schools in the West Seneca school district. Our scope consisted of: Installation of ...
![211 Niagara Street](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/2012-05-18_16-33-11_999-400x250.jpg)
211 Niagara Street
This project was an addition on to an existing Sunoco gas station for a new subway restaurant. We did all of the ...
![Chiampou Travis Besaw & Kershner LLP](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/Chiampo-Job-085_1024x768-400x250.jpg)
Chiampou Travis Besaw & Kershner LLP
This was a 3000SF building addition along with parking lot expansion, new curb, new sidewalk, foundation ...
![Trader Joes](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/I-Phone1-031_1024x768-400x250.jpg)
Trader Joes
OTC was subcontracted to perform the foundation excavation and back filling for Engasser Construction Corp.
![Erie County Water Authority](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/POLE-BARN-060_1067x800-400x250.jpg)
Erie County Water Authority
On Track Construction Inc. performed the site cut and fill for the new 3000 SF pole barn. Work also included SOG ...
![Hampton Inn](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/Iphone-2-20-15-022_1024x768-400x250.jpg)
Hampton Inn
This was a 4 story Hampton Inn hotel project. We had the total site package including utility line removals, ...
![West Herr GMC](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/Iphone-2-20-15-017_1024x768-400x250.jpg)
West Herr GMC
OTC performed foundation excavation and back filling, new utilities including water, sanitary sewer, and storm ...
![East Aurora Fire Hall](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/I-Phone1-071_1024x768-400x250.jpg)
East Aurora Fire Hall
On Track Construction Inc was sub contracted to perform the site excavation and undercuts for the fire hall ...
![South Gate Plaza](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/I-Phone-8-11-15-175_1024x768-400x250.jpg)
South Gate Plaza
OTC Inc. was contracted to back fill the entire basement (19K+SF) with compact-able fill up to sub-grade for the ...
![West Herr Toyota](https://www.ontracksitedevelopment.com/wp-content/uploads/2019/06/I-Phone-8-11-15-074_1024x768-400x250.jpg)
West Herr Toyota
This job consisted of a 24K SF addition to the existing West Herr Toyota building. OTC provided saw cutting, site ...