West Herr Toyota Hamburg NY

This job consisted of a 24K SF addition to the existing West Herr Toyota building. OTC provided saw cutting, site cut and export of 6000 CY’s of dirt, sub base and compaction, site utilities including new fire and domestic water service with hot box and RPZs, all storm sewer, new sanitary sewer with oil water […]

Comments

This job consisted of a 24K SF addition to the existing West Herr Toyota building. OTC provided saw cutting, site cut and export of 6000 CY’s of dirt, sub base and compaction, site utilities including new fire and domestic water service with hot box and RPZs, all storm sewer, new sanitary sewer with oil water separator, interior plumbing excavation and back filling, SOG prep, all paving prep, all concrete prep, and topsoil placement.

Aug

28

South Gate Plaza West Seneca NY

OTC Inc. was contracted to back fill the entire basement (19K+SF) with compact-able fill up to sub-grade for the new LA Fitness that is scheduled to be built. Work included removal, saw cutting, breaking of existing walls below grade, select back fill and compaction to a minimum 95% rating/lift, and the maintenance and protection of […]

Comments

OTC Inc. was contracted to back fill the entire basement (19K+SF) with compact-able fill up to sub-grade for the new LA Fitness that is scheduled to be built. Work included removal, saw cutting, breaking of existing walls below grade, select back fill and compaction to a minimum 95% rating/lift, and the maintenance and protection of the existing buildings that were to remain.

Aug

28

East Aurora Fire Hall East Aurora NY

On Track Construction Inc was sub contracted to perform the site excavation and undercuts for the fire hall foundations, and placing the fill and settlement plates in the fall of 2013. In 2014 we were sub contracted by Engasseer Construction Corp. to perform all of the excavation/back filling for the new fire hall foundations.  

Comments

On Track Construction Inc was sub contracted to perform the site excavation and undercuts for the fire hall foundations, and placing the fill and settlement plates in the fall of 2013. In 2014 we were sub contracted by Engasseer Construction Corp. to perform all of the excavation/back filling for the new fire hall foundations.

 

Aug

28

West Herr GMC East Aurora NY

OTC performed foundation excavation and back filling, new utilities including water, sanitary sewer, and storm sewer. All saw cutting for interior removal of slabs and trench drains, prep for new SOG and trench drains, and all associated restoration/patch work.

Comments

OTC performed foundation excavation and back filling, new utilities including water, sanitary sewer, and storm sewer. All saw cutting for interior removal of slabs and trench drains, prep for new SOG and trench drains, and all associated restoration/patch work.

Aug

28

Hampton Inn Niagara Falls NY

This was a 4 story Hampton Inn hotel project. We had the total site package including utility line removals, cutting and capping, site stripping, site cut and export, SOG prep, foundation excavation and back filling including undercuts, All site utilities including storm, sanitary, water, electric line excavation/back fill, bio retention areas, all interior plumbing excavation […]

Comments

This was a 4 story Hampton Inn hotel project. We had the total site package including utility line removals, cutting and capping, site stripping, site cut and export, SOG prep, foundation excavation and back filling including undercuts, All site utilities including storm, sanitary, water, electric line excavation/back fill, bio retention areas, all interior plumbing excavation and back filling, concrete curbs and walks, dumpster pad, parking signs, and all paving.

Aug

28

Erie County Water Authority Orchard Park NY

On Track Construction Inc. performed the site cut and fill for the new 3000 SF pole barn. Work also included SOG prep, parking lot prep, new 2″ copper water service, electrical service, storm sewer with retention pond and outlet structure, rip rap work, and final grading/seeding.

Comments

On Track Construction Inc. performed the site cut and fill for the new 3000 SF pole barn. Work also included SOG prep, parking lot prep, new 2″ copper water service, electrical service, storm sewer with retention pond and outlet structure, rip rap work, and final grading/seeding.

Aug

28

Trader Joes Amherst NY

OTC was subcontracted to perform the foundation excavation and back filling for Engasser Construction Corp.

Comments

OTC was subcontracted to perform the foundation excavation and back filling for Engasser Construction Corp.

Aug

05

Chiampou Travis Besaw & Kershner LLP

This was a 3000SF building addition along with parking lot expansion, new curb, new sidewalk, foundation excavation/backfill, and a new 6″ fire service line.  

Comments

This was a 3000SF building addition along with parking lot expansion, new curb, new sidewalk, foundation excavation/backfill, and a new 6″ fire service line.

 

Jan

16

211 Niagara St Buffalo NY

211 Niagara St Buffalo: This project was an addition on to an existing Sunoco gas station for a new subway restaurant. We did all of the site preparation which entailed the removal of the old parking lot. Cutting the grade down 3ft for the new slab on grade. Excavating and backfilling for the new walls. […]

Comments
211 Niagara St Buffalo: This project was an addition on to an existing Sunoco gas station for a new subway restaurant. We did all of the site preparation which entailed the removal of the old parking lot. Cutting the grade down 3ft for the new slab on grade. Excavating and backfilling for the new walls. Slab on grade prep. Roof gutter drain installation. And the sanitary sewer tie in.

 

May

01

West Seneca CSD

West Seneca CSD: This project was between three schools in the West Seneca school district. Our scope consisted of:   Installation of all erosion control. Removal of concrete sidewalks and headwalls. Removal of 125′ of sanitary sewer and 2 manholes. Installation of temporary access roads and staging areas, 34,000 Sqft. Installation of 600′ of storm sewer […]

Comments

West Seneca CSD: This project was between three schools in the West Seneca school district. Our scope consisted of:   Installation of all erosion control. Removal of concrete sidewalks and headwalls. Removal of 125′ of sanitary sewer and 2 manholes. Installation of temporary access roads and staging areas, 34,000 Sqft. Installation of 600′ of storm sewer and 5 catch basins. Installation of 100′ of sanitary sewer and 1 manhole. Excavation and backfill for over 400′ of new footings and walls, including spread footings, step walls, and new building pads. All prep/grade work for 350′ of new sidewalk. All final grading and hydro seeding. 42,000 Sqft